Customer’s Need:
The building is completely uninsulated. Replace the storage heater, since no pleasant temperature was reached and the old heating system was difficult to control. Discreet heating system that saves space, without maintenance effort and maintenance costs.
easyTherm Solution:
Ceiling installation of highly effective industrial panels in a specially designed model with easyTherm control system.
Property | Chapel of rest Mürzzuschlag |
---|---|
Location | 8680 Mürzzuschlag |
Year of Manufacture | January 2015 |
Heated area | 72 m² |
Power input | 8,100 Watts |
Total investment costs | approx. 11,000-- Euro |
Special customer benefit | Sufficient heat supply and easy to control |
Implementing electrical partner | Stadtwerke Mürzzuschlag GmbH, Mariazeller Straße 45, 8680 Mürzzuschlag |